Project Spotlight
 
 
 
 

Northwood PK-12, Northwood, Ohio 

Northwood PK - 12 in Ohio showcased some of our most intricate and interesting millwork.  The cheerful laminate wallscape features padded benches for student seating, as well as display shelves for awards.  It's a home run in our book!  Project by Farnham Equipment Company in Ohio

Installed in 2017, the school consolidated lower grades on the first level, with 7-12 grades on an upper level.  In addition to the creative millwork, school planners chose traditional and lab casework. 

The project architect was Fanning Howy Associates, with Rudolph Libbe, Inc. serving as construction managers.    

Email your project images and details to Patrick Gibbons.  Your project might be the next feature!  View additional projects on StevensAdvantage.com.
 
 
 
 
 

Happy Holidays!  

We wish you happiness and health this holiday season, and prosperity in the New Year!  Stevens Industries will be closed December 24, 25, 31 and January 1.  We will be operating with limited staff during the holiday week.
 
 
 
 
 
Superior Construction    
Stevens Advantage Drawer Boxes  

Stevens Advantage casework is designed to give your projects an advantage in vetted materials and superior construction.  The strength of each component has been tested and evaluated to ensure a long and trouble-free lifespan.

Attesting to the strength of our drawer boxes:
  • Full four-sided box design of 3/4" thick TFL (thermally fused laminate) material
  • 8mm diameter fluted wood dowel pin structural joint connection using PVA glue
  • Removable overlay fronts / adjustable for alignment
  • Drawer bottom 1/4" thick Grade 220 MDF (Medium Density Fiberboard) with TFL
  • Drawer bottom mechanically captured in groove, PVA glued and stapled to sides every 4" – out of sight on underside of drawer
  • Under heavy side load testing, the drawer side material fails – not the PVA glued joint
  • 1/2" thick material remaining from drawer bottom edge and exterior of side. Drawer slide screw insertion does not cause core or surfacing failures.
  • Easily passes SEFA drawer mechanical properties testing for strength
 
 
 
 
 
Expansion to Increase Capacity  

An expansion on the North end of Stevens' Teutopolis facility broke ground in late October. 

The addition will increase the manufacturing footprint by nearly 50,000 sq ft, and will be operational in the spring.  It will house a new assembly line, increasing capacity.  This is the second expansion project in 2018, the first being the purchase of the 200,000 sq ft Stevens Avenue Facility in nearby Effingham, Illinois.  Stevens is actively preparing and planning for growth, with an eye to better serving our customers. 

Watch for more updates as construction gets underway!
 
 
 
 
 
Project Photos 
Submissions for Project Profiles

Project photo collections are tremendous sales tools for your fast-moving bidding season.  Join us in compiling a comprehensive set of project photos. 

Submit photos to Patrick Gibbons. Please include one outside shot including the building sign, along with five to six interior photos.  If possible, try to hide away boxes, large trash receptacles, ladders and clutter to achieve clean, attractive photos that can be used in marketing.   
 
 
 
Project Profile →
Request a Sample →
Watch Videos →
 
 
VISIT, MAIL, OR CALL US
704 W. Main Street  |  Teutopolis, IL 62467  |  Phone: 217-857-7100
 
 
Find a Dealer →
Footer-logo